
Home > Customer Service > Deposits & Charges
Residential: Two-twelfths of estimated annual billings with a minimum deposit of $100 and a maximum deposit of $300.
Non-Residential: Two-twelfths of estimated annual billings or as determined by the District.
Residential: None if with an electric account. Two-twelfths of estimated annual billing if water only.
Non-Residential: None if with an electric account. Two-twelfths of estimated annual billing if water only.
* Satisfactory credit record with the District or credit reference may allow the District to waive the deposit requirement.
Connect / Reconnect / Disconnect / Read-out Charges - applicable to standard new or existing services. (Read-outs charged to incoming, not out-going)
| Electric | |
|---|---|
| 1) Meter, including multiple meters for same acct. |
$30 |
| 2) Seperate acct. at same location | $20 |
| 3) Using last reading | $10 |
| Water | |
|---|---|
| 1) Independent of electric |
$30 |
| 2) (Simultaneous with electric) | $20 |
| 3) Using last reading | $10 |
| Sewer | |
|---|---|
| 1) Independent of electric |
$15 |
| 2) Simultaneous with electric | $10 |
| 3) Inspect customer connection | $220 |
| 4) Check Valve Assembly (SSA I only) | $345 |
| After Hours & Nonpayment | |
|---|---|
| 1) Electric only or water only |
$60 |
| 2) Electric and water | $65 |
| 3) Additional charge to above: (actual cost) | $210 |
a) Requests received between 3:30PM and 4:30PM on regular business days (per 1/2 hr.) |
$40/min |
b) Requests received between 4:30PM and 8:00AM of the next business day |
$230/min |
| Reread Meter (customer request due to high consumption) No charge if reading is incorrect | $30 |
Includes connect charge and engineering charge
| Electric – Overhead – Self-contained meter only | |
|---|---|
| 1) Single Phase – Existing Overhead Transformer (Inc. OH Triplex svc to cust bldg) |
$320 |
| 2) Single phase – Install new overhead transformer (Inc. OH Triplex svc to cust bldg) |
$945 |
| 3) Single phase – Install new ovh transformer during line extension (Inc. OH Triplex svc to cust bldg) | $610 |
| 4) Three phase – Existing overhead transformers (Inc. OH Quad svc to cust bldg) |
$660 |
| 5) Three phase – Install new overhead transformers (Inc. OH Quad svc to cust bldg) |
$1,480 |
| 6) Three phase – Install new overhead transformers during line ext. (Inc. OH Quad svc to cust bldg) | $1,245 |
| Electric – Padmount – Self-contained meter only | |
| 7) Single phase – Existing padmount transformer | $235 |
| 8) Single phase – Install new padmount transformer | $625 |
| 9) Single phase – Install new padmount transformer during line ext. | $330 |
| 10) Three phase – Existing padmount transformer | $265 |
| 11) Three phase – Install new padmount transformer | $640 |
| 12) Three phase – Install new padmount transformer during line ext. | $350 |
| Electric – Others: | |
| 13) CT Meter Connection (in addition to one of the above) | |
a) Up to and including 800 AMP |
$155 |
b) Greater than 800 AMP |
$215 |
| 14) Each additional meter at a multiple installation involving a single service run and meters being installed at the time of the original connection. | $25 |
| 15) Net Meter Installation | |
a) Standard Meter |
$65 |
b) AMR Meter |
$585 |
c) CT Meter |
$755 |
d) AMR-CT Meter |
$815 |
| 16) Renewable Energy Production Meter Installation | |
a) Standard Meter |
$95 |
b) AMR Meter |
$165 |
c) CT Meter |
$345 |
d) AMR-CT Meter |
$415 |
| 17) Temporary Service – in addition to above new service charge | $65 |
| 18) Temporary Service – Communuity Sponsored Festival Only | $115 |
| 19) Unmetered installations – single-phase, overhead installation | |
a) Connection to existing transformer |
$215 |
b) Install transformer, includes connect service |
$660 |
| Water | |
|---|---|
| 1) All water systems – 3/4” meter installed in an existing meter box | $130 |
| 2) Pressure Reducing Valve - See below * Included with meter installation if, in the opinion of the District, one is needed. ** An additional charge shall be made for a Pressure Regulator Valve if one is required. |
|
| 3) All Water Systems (See chart Below) | |
| Meter Size | Meter Installation | Capital Facilities Charges | Total | Pressure Regulator Valve (if required) |
|---|---|---|---|---|
| 3/4" | $1,985 | $3,890 | $5,875 | $445* |
| 1" | $2,210 | $9,725 | $11,935 | $645** |
| 1-1/2" | $4,050 | $19,455 | $23,505 | $2,095** |
| 2" | $4,640 | $31,125 | $35,765 | $2,175** |
| 3" | At Cost | $62,250 | At Cost + $62,250 | At Cost ** |
| 4" | At Cost | $97,260 | At Cost + 97,260 | At Cost** |
| 6" | At Cost | $194,520 | At Cost + $194,520 | At Cost** |
| 8" | At Cost | $311,230 | At Cost + $311,230 | At Cost** |
| 10" | At Cost | $447,395 | At Cost + $447,395 | At Cost** |
| Note: Water hookup charges vary from system to system. Contact the Water Department for the correct ammount. | ||||
| Sewer | |
|---|---|
| 1) Hookup Charge |
|
a) Sunshine Acres I |
$0 |
b) Sunshine Acres II |
$0 |
c) View Ridge |
$4,536.45 |
| 2) Availability / Assessment Charge | |
a) Sunshine Acres I |
$52/Year |
b) Sunshine Acres II (while available) |
$2,857.36 / bedroom |
c) View Ridge |
$0 |
| Misc. Service Charges - Alphabetical Order |
|
|---|---|
| Access Appointment (e.g.: Maintenance & Repair) | |
1) Electric |
$60 |
2) Water |
$55 |
| Continuous Service Contract | $35 |
| Customer Service Conversion | |
1) Convert overhead service to underground service |
$95 |
2) Change meter base to larger meter base size |
$110 |
3) Upgrad overhead service wire to larger size |
$250 |
| Easements and Other Recorded Documents | |
1) Easements / Bill of Sale |
$105 |
2) Replacement Easements |
$115 |
3) Quit Claim Deeds |
$115 |
| Energy Resources Surcharge | |
1) Regular Charge |
$2,000 |
2) Owner-occupied, low-income charge |
$500 |
| Engineering Charge for Developer Proposals | Actual cost over $1,000 |
| Field Collection | $45 |
| Field Door Hanger | $30 |
| Fire Hydrant Fund* | $3.55/ft (6" and larger mains) |
* Exception: when a hydrant is required in a specific location by other regulatory authority, the customer will pay the actual cost of installation. |
|
| Fire Hydrant Use - Temporary Service | |
1) Connection to hydrant - 3/4" |
$55 |
2) Meter usage / damage deposit - 3/4" |
$385 |
3) Connection hydrant - 2" or 3" |
$105 |
4) Meter usage / damage deposit - 2" or 3" |
$665 |
5) RPBA usage / damage deposit 2" or 3" |
$615 |
| Increased Loads - requires a connect charge also when transformer charge-out is required to maintain adequate service | |
1) Single overhead |
$450 |
2) Two overhead |
$635 |
3) Three overhead |
$760 |
4) Single padmount |
$335 |
5) Two padmount |
$530 |
6) Three-phase padmount |
$575 |
| Lock Box - installed (one size only) | $310 |
| Meter Tampering | |
1) Cut or missing seal (electric or water) |
$115 |
2) Unauthorized connect or reconnect of meter (electric or water) |
$155 |
3) Power diversion investigation - actual cost & requires W.O. |
$290 (min) |
4) Water diversion investigation - actual cost & requires W.O. |
$255 (min) |
| Meter Testing | |
1) Electric Meter |
$55 |
2) Water Meter |
$80 |
| Non-Sufficient Funds (State Limit) | $45 |
| Remote-Read Meter Installation | |
1) Electric |
$130 |
2) Electric - CT Meter |
$140 |
3) Water |
$130 |
| Trip Charge (Customer not prepared for scheduled work) | |
1) Electrical Serviceman |
$65 |
2) Line Crew |
$175 |
3) Water Serviceman |
$55 |
| Vegetation Removal | $50 |
| Yard Lights | |
1) Install light only, along with new service |
$45 |
2) Install light only, established acct. |
$205 |
3) Install pole and light |
$910 |
4) Additional pole at same time, without a light |
$605 |