top

Home > Customer Service > Deposits & Charges

Deposits & Charges

Electric

Residential: Two-twelfths of estimated annual billings with a minimum deposit of $100 and a maximum deposit of $300.

Non-Residential: Two-twelfths of estimated annual billings or as determined by the District.

Water

Residential: None if with an electric account. Two-twelfths of estimated annual billing if water only.

Non-Residential: None if with an electric account. Two-twelfths of estimated annual billing if water only.

* Satisfactory credit record with the District or credit reference may allow the District to waive the deposit requirement.

Charges

Connect / Reconnect / Disconnect / Read-out Charges - applicable to standard new or existing services. (Read-outs charged to incoming, not out-going)

Electric
1) Meter, including multiple meters for same acct.
$30
2) Seperate acct. at same location $20
3) Using last reading $10
Water
1) Independent of electric
$30
2) (Simultaneous with electric) $20
3) Using last reading $10
Sewer
1) Independent of electric
$15
2) Simultaneous with electric $10
3) Inspect customer connection $220
4) Check Valve Assembly (SSA I only) $345
After Hours & Nonpayment
1) Electric only or water only
$60
2) Electric and water $65
3) Additional charge to above: (actual cost) $210
a) Requests received between 3:30PM and 4:30PM on regular business days (per 1/2 hr.)
$40/min
b) Requests received between 4:30PM and 8:00AM of the next business day
$230/min
Reread Meter (customer request due to high consumption) No charge if reading is incorrect $30

New Service Charges

Includes connect charge and engineering charge

Electric – Overhead – Self-contained meter only
1) Single Phase – Existing Overhead Transformer
(Inc. OH Triplex svc to cust bldg)
$320
2) Single phase – Install new overhead transformer
(Inc. OH Triplex svc to cust bldg)
$945
3) Single phase – Install new ovh transformer during line extension (Inc. OH Triplex svc to cust bldg) $610
4) Three phase – Existing overhead transformers
(Inc. OH Quad svc to cust bldg)
$660
5) Three phase – Install new overhead transformers
(Inc. OH Quad svc to cust bldg)
$1,480
6) Three phase – Install new overhead transformers during line ext. (Inc. OH Quad svc to cust bldg) $1,245
Electric – Padmount – Self-contained meter only
7) Single phase – Existing padmount transformer $235
8) Single phase – Install new padmount transformer $625
9) Single phase – Install new padmount transformer during line ext. $330
10) Three phase – Existing padmount transformer $265
11) Three phase – Install new padmount transformer $640
12) Three phase – Install new padmount transformer during line ext. $350
Electric – Others:
13) CT Meter Connection (in addition to one of the above)
a) Up to and including 800 AMP
$155
b) Greater than 800 AMP
$215
14) Each additional meter at a multiple installation involving a single service run and meters being installed at the time of the original connection. $25
15) Net Meter Installation  
a) Standard Meter
$65
b) AMR Meter
$585
c) CT Meter
$755
d) AMR-CT Meter
$815
16) Renewable Energy Production Meter Installation
a) Standard Meter
$95
b) AMR Meter
$165
c) CT Meter
$345
d) AMR-CT Meter
$415
17) Temporary Service – in addition to above new service charge $65
18) Temporary Service – Communuity Sponsored Festival Only $115
19) Unmetered installations – single-phase, overhead installation  
a) Connection to existing transformer
$215
b) Install transformer, includes connect service
$660
Water
1) All water systems – 3/4” meter installed in an existing meter box $130
2) Pressure Reducing Valve - See below
* Included with meter installation if, in the opinion of the District, one is needed.
** An additional charge shall be made for a Pressure Regulator Valve if one is required.
 
3) All Water Systems (See chart Below)  
Meter Size Meter Installation Capital Facilities Charges Total Pressure Regulator Valve
(if required)
3/4" $1,985 $3,890 $5,875 $445*
1" $2,210 $9,725 $11,935 $645**
1-1/2" $4,050 $19,455 $23,505 $2,095**
2" $4,640 $31,125 $35,765 $2,175**
3" At Cost $62,250 At Cost + $62,250 At Cost **
4" At Cost $97,260 At Cost + 97,260 At Cost**
6" At Cost $194,520 At Cost + $194,520 At Cost**
8" At Cost $311,230 At Cost + $311,230 At Cost**
10" At Cost $447,395 At Cost + $447,395 At Cost**
Note: Water hookup charges vary from system to system. Contact the Water Department for the correct ammount.
Sewer
1) Hookup Charge
a) Sunshine Acres I
$0
b) Sunshine Acres II
$0
c) View Ridge
$4,536.45
2) Availability / Assessment Charge
a) Sunshine Acres I
$52/Year
b) Sunshine Acres II (while available)
$2,857.36 / bedroom
c) View Ridge
$0
Misc. Service Charges - Alphabetical Order
Access Appointment (e.g.: Maintenance & Repair)
1) Electric
$60
2) Water
$55
Continuous Service Contract $35
Customer Service Conversion
1) Convert overhead service to underground service
$95
2) Change meter base to larger meter base size
$110
3) Upgrad overhead service wire to larger size
$250
Easements and Other Recorded Documents
1) Easements / Bill of Sale
$105
2) Replacement Easements
$115
3) Quit Claim Deeds
$115
Energy Resources Surcharge
1) Regular Charge
$2,000
2) Owner-occupied, low-income charge
$500
Engineering Charge for Developer Proposals Actual cost over $1,000
Field Collection $45
Field Door Hanger $30
Fire Hydrant Fund* $3.55/ft (6" and larger mains)
* Exception: when a hydrant is required in a specific location by other regulatory authority, the customer will pay the actual cost of installation.
 
Fire Hydrant Use - Temporary Service
1) Connection to hydrant - 3/4"
$55
2) Meter usage / damage deposit - 3/4"
$385
3) Connection hydrant - 2" or 3"
$105
4) Meter usage / damage deposit - 2" or 3"
$665
5) RPBA usage / damage deposit 2" or 3"
$615
Increased Loads - requires a connect charge also when transformer charge-out is required to maintain adequate service
1) Single overhead
$450
2) Two overhead
$635
3) Three overhead
$760
4) Single padmount
$335
5) Two padmount
$530
6) Three-phase padmount
$575
Lock Box - installed (one size only) $310
Meter Tampering
1) Cut or missing seal (electric or water)
$115
2) Unauthorized connect or reconnect of meter (electric or water)
$155
3) Power diversion investigation - actual cost & requires W.O.
$290 (min)
4) Water diversion investigation - actual cost & requires W.O.
$255 (min)
Meter Testing
1) Electric Meter
$55
2) Water Meter
$80
Non-Sufficient Funds (State Limit) $45
Remote-Read Meter Installation
1) Electric
$130
2) Electric - CT Meter
$140
3) Water
$130
Trip Charge (Customer not prepared for scheduled work)
1) Electrical Serviceman
$65
2) Line Crew
$175
3) Water Serviceman
$55
Vegetation Removal $50
Yard Lights
1) Install light only, along with new service
$45
2) Install light only, established acct.
$205
3) Install pole and light
$910
4) Additional pole at same time, without a light
$605

Print this page